Encavis et al. v. Italy

Case summary

At a glance

Parties
Encavis AG (Germany) and 58 Italian operating companies it owns v. the Italian Republic
Case no.
ICSID Case No. ARB/20/39
Forum and rules
ICSID Convention arbitration; ICSID Arbitration Rules 2006; place of proceeding Paris (hearing held in London)
Treaty
Energy Charter Treaty
Tribunal
Prof. Juan Fernández-Armesto (President), Ms. Wendy Miles KC, Mr. Alexis Mourre
Sector
Renewable energy; solar photovoltaic
Outcome
Unanimous award of 11 March 2024: jurisdiction upheld, all claims dismissed on the merits, no compensation due.
Amount
No damages awarded. Total administrative costs of USD 828,426.91 split equally (USD 414,213.45 per side); each party bears its own legal costs. Claimed costs: claimants EUR 2,431,566 plus USD 525,000; Italy EUR 1,765,000 plus USD 500,000.

The dispute

Encavis AG, a German investment company, and 58 Italian companies it owns invested between 2009 and 2013 in about 78 photovoltaic plants. The plants were enrolled in Italy's Conto Energia feed-in incentive programme and, for most of them, in the Minimum Guaranteed Price (MGP) scheme. The claimants challenged two measures. The first was the December 2013 measures: the New MGP Resolution and the Destinazione Italia Decree, which cut the MGP and then ended it for plants that also received Conto tariffs. The second was the June 2014 Spalma-incentivi Decree, which reduced tariffs for existing plants; most plants defaulted into Option C, a cut of 6–8%. The claimants alleged breaches of Article 10(1) ECT: the stable-conditions obligation, the non-impairment rule, fair and equitable treatment (legitimate expectations) and the umbrella clause. Italy raised three jurisdictional objections (no diversity of nationality, the exclusive Rome forum clauses in the GSE Convenzioni together with the ECT fork-in-the-road clause, and the intra-EU objection). On the merits it argued that the measures were a proportionate exercise of its right to regulate.

Key holdings

  1. Diversity-of-nationality objection rejected. Encavis is organised under German law, and Germany is a Contracting Party distinct from Italy. The Italian subsidiaries qualify under Art. 26(7) ECT because Encavis controls them. That the EU is also a Contracting Party, and that EU citizenship exists, does not matter. Award ¶¶ 149–159
  2. The exclusive Rome forum clause in the Convenzioni does not bar the treaty claims. It is not a "previously agreed dispute settlement procedure" under Art. 26(2)(b). It covers contract claims against the GSE, not ECT claims against Italy. Award ¶¶ 205–209
  3. The fork-in-the-road clause was not triggered. Italy's Annex ID statement allows an investor to drop a pending domestic case and arbitrate instead, and the Lazio administrative cases had been withdrawn or had lapsed. Applying a triple-identity test, the Tribunal also found that the parties, causes of action and relief sought were not the same. Award ¶¶ 221–247
  4. No breach of the stable-conditions obligation in the first sentence of Art. 10(1), which the Tribunal treats as a free-standing obligation. The 7–8% tariff cut and the MGP changes did not radically alter the regime. The claimants still receive fair remuneration. "Costante in moneta corrente" means only that tariffs are not indexed to inflation. The measures pursued legitimate public interests (cutting the cost of incentives borne by consumers, sustainability of the scheme), were proportionate, and were adopted transparently. Award ¶¶ 665–713
  5. No breach of the non-impairment rule. The measures were not arbitrary or retroactive: they affected only future payments and did not touch incentives already received. They were not discriminatory, because other energy producers are not valid comparators for solar producers. Award ¶¶ 722–743
  6. No breach of fair and equitable treatment. Neither the 2003 Legislative Decree, the Conti, the Tariff Confirmation Letters, the Convenzioni (accessory contracts) nor public statements contained a stabilisation commitment, and the MGP scheme gave no guarantee of price levels. The umbrella-clause claim was also rejected. The Tribunal relied on SunReserve, Silver Ridge and Prof. Sacerdoti's dissent in Greentech. Award ¶¶ 799–847
  7. Costs. Italy won overall, but its jurisdictional objections all failed and the claims were not frivolous. Each side therefore bears half of the administrative costs (the claimants also bear the lodging fee) and its own legal costs. Award ¶¶ 859–863

Procedural history

  1. 21 September 2020Request for Arbitration filed. ICSID registered it on 6 October 2020.
  2. 16 February 2021Tribunal constituted.
  3. 19 March 2021First session held by video conference.
  4. 21 May 2021Procedural Order No. 1 on procedural rules and timetable; the hearing was to be held in Paris.
  5. 21 May 2021Procedural Order No. 2 on document production, guided by the IBA Rules.
  6. 15 June 2022Decision granting the European Commission leave to file a non-disputing party submission limited to the intra-EU objection. Its requests for full file access and to attend the hearing were refused for the time being.
  7. 1 July 2022European Commission filed its amicus curiae brief.
  8. 10–13 October 2022Hearing on jurisdiction and merits at the IDRC in London.
  9. 11 March 2024Award dispatched: jurisdiction upheld, all claims dismissed, costs shared.

Tribunal, counsel and experts

Decided by
For the claimant
King & Spalding LLP
Experts
Fabien Roques (claimant) · Richard Edwards (claimant) · Anna Romano (respondent) · Corrado Gatti (respondent)

Run a conflict check on these names →

Keywords

Summary generated with AI from the published documents — refer to the award for the authoritative text.